Success stories

Learn about our partnerships that have resulted in winning projects for our customers.

What’s new

Stay informed about telecommunications market trends.

Support

Customer support and simplified ticketing. Find support materials and quick answers. Explore now!

Technical Support
Support Materials
Frequently Asked Questions
Contact us
Discontinued

GPON OPTICAL MODEM LW710-40BP

Code - 35510464

Description

The GPON ONT LW710-40BP is a terminal equipment compliant with the ITU-T G.984. It has 4 data ports 10/100/1000 Base-T Gigabit Ethernet that supports Power over Ethernet(POE) feature, which could implement electrical power and data connectivity over a single Ethernet cable. Supports data rates up to 1.25 Gbps upstream and 2.5 Gbps downstream.

General Characteristics

  • Applications in convergent IP systems;
  • Allows connection of 4 data ports with PoE(Power over Ethernet) support;
  • Enables VLAN configuration on each port;
  • Has protected optical input;
  • Transmission Wavelenght: 1310 nm;
  • Reception Wavelenght: 1490 nm;
  • Optical Transmission Power : 0,5dBm ~ +5dBm;
  • Optical Reception Power : -8dBm ~ -27dBm;
  • Flexible mapping between GEM Ports and T-CONTs.

Would you like to compare this product with another?

Compare right now

Apresentando Lightera

Furukawa Electric LatAm, Furukawa Electric & Cable, e OFS agora são Lightera.

Para Suporte Técnico, Informações sobre Fornecedores e Carreiras, use o site atual. Observe que furukawalatam.com será desativado no final de abril.

Presentamos Lightera

OFS, Furukawa Electric Fiber & Cable y Furukawa Electric LatAm ahora son Lightera.

Para Soporte Técnico, Información para Proveedores y Carreras, utilice el sitio actual.

Por favor, tenga en cuenta que el sitio furukawalatam.com será desactivado a finales de abril.

Introducing Lightera

Furukawa Electric LatAm, Furukawa Electric & Cable, and OFS are now Lightera.

For Technical Support, Supplier Info and Careers, please use the current site. Please note that furukawalatam.com will be shuttered at the end of April.