Historias de éxito
Conoce las historias de éxito de los clientes que han utilizado las soluciones Furukawa en los segmentos más diversos, sus retos y particularidades.
Especificação Técnica
DescargaFuente de alimentación para conversión de corriente alterna (AC) para corriente continua (DC), para uso en módem Furukawa GPON FK-ONT-G400B / PoE S2.
Características generales
ACCESORIO PARA INFRAESTRUCTURA DE TELECOMUNICACION
Fuente de alimentación 90W para conversión de corriente alternada (AC) para corriente contínua (DC), para uso en modem óptico GPON PoE Furukawa de 4 puertos.
|
EMI STANDARDS |
The power supply shall meet the radiated and conducted emission requirements for FCC part 15 CLASS B, EN55022 CLASS B, AS/NZS CISPR22 CLASS B. EN61000-3-2 CLASS D, EN61000-3-3. Remark: 6dBA margin minimum.
|
EMS STANDARDS |
EN61000-4-2 Electrostatic Discharge (ESD)
Static – discharge test by contact or air should be conducted with
Static – discharge teeter, energy storage capacitance of 150pF, and discharge resistance of 330Ω. 15KV air discharge,8KV contact discharge, Performance Criterion A
EN61000-4-3 RADIATED ELECTROMAGNETIC FIELDS(RS)
Radio- frequency Electromagnetic Field Susceptibility Test, RS, 80-1000MHz, 3V/m, 80%AM(1KHz), Performance Criterion A.
EN61000-4-4 Electrical Fast Transient / Burst (EFT)
Power Line to Line/Line to Earth: 1KV. Performance Criterion A.
EN61000-4-5 Lightning Surge Attachment
Lightning Surge voltage of differential and common modes shall be applied across AC input lines and across input and frame ground. Power Line to Line: 2.5KV. Line to Earth: 4 KV. Performance Criterion A.
EN61000-4-6 CONDUCTED RADIO FREQUENCY DISTURBANCES(CS)
Conducted Radio Frequency Disturbances Test, CS, 0.15-80 MHz, 3Vrms, 80%AM, 1KHz, Performance Criterion A.
EN61000-4-8 POWER FREQUENCY MAGNETIC FIELD
Power Frequency Magnetic Field Test, 50Hz, 3A/m. Performance Criterion A.
EN61000-4-11 VOLTAGE DIPS/SHORT INTERRUPTION/VARIAIONS
Voltage Dips, 30% reduction- 10ms, Performance Criterion B, 60%. Reduction – 100ms, Performance Criterion B, Voltage Interruptions>95%. Reduction – 5000ms, Performance Criterion B.
|
La cobertura de la garantía del producto y el servicio de soporte técnico están condicionados al uso exclusivo de equipos de la familia GPON Furukawa (OLTs, ONUs, Fuentes de Alimentación, Transceptores, …).